
So September will officially be my last payment on the Bonneville and I'll be picking up a second job in the next couple weeks. As soon as it's paid off I'm buying a winter beater & the Bonneville will be moving into the garage for the winter
Performance 2013/14 plans
-High Performance Coil Pack
-Intense Stage 2 Performance Package
-3" Downpipe & High Flow Cat (keeping resonator)
-Intense Shift Kit
-Front & Rear Suspension Overhaul (Replacing just about everything)
-Front Strut Tower Brace Install
-Aluminum Coolant Elbows
-180 Degree T-Stat
Body & Exterior
-Resurface Window Trim
-Tint Windows (35% front & 25% rear)
-GXP Taillights
-New Fog Lamps
-Replace Fuel Filler Neck
-Rustproof Underbody
Interior
-Repair Headliner & Sunroof Cover
-Repair Burnt Switch Bulbs
-Find & Fix Any Water Leaks
-Remove Spare Tire & Jack - 6x9 Delete
-Eventually Replace Front Seat Leather Covers
-Replace Console From 02+ Bonneville
-Install Single LED's in Front & Rear Console Cupholders
Body
-Car Will Be Getting Painted Once It's Close To Being Finished
-Factory Galaxy Silver, Black or Dark Gunmetal Metallic - I can't decide
-New Metal Around Fuel Door
-Pinstripe
-GXP Rear Spoiler
I'm sure some of this stuff will change as this project goes on but as of now - this is my rough draft of what I'd like to see when it's finished. Don't think i'll be using this car as my daily driver for awhile so with me working two jobs I'll finally be able to afford to start this project!





