I figured I'd post up an update for the members that don't stray far from this site.
ZZP has the GenV IC cores in stock but they aren't the phenolic material, I asked Zoomer when they will have the phenolic, waiting for an answer.
So in the meantime... some updates on this project.
Here is a pic or two of the LIM P&P not including the port match because I haven't lined up the new LIM to the heads yet.
of course I had to cut open the LIM for full flow thru the IC.
In this photo you can see the cylinder number 2 & 4 intake runners port & polish work.

This is a cool photo of, I think cylinder number 4 or 6 looking thru to 5... or the reverse...

Some parts laying around.

Now for some blower P&P.. actually just polishing.

Pulling off the ZZP hub, its for sale BTW.

This is the tool that turns down the snout for sub 2.8" pulleys. and BTW, I own it so if someone needs to use one,

Now the proper hub is installed and the pulley is on and looking good.

And for those of you that are wondering how much clearance I have for the pulley... probabely because ZZP goes way beyond and it looks like crap.. here is a side clearance shot.

Now for the other end, the TB adaptor plate and N* are already installed.

Another angle.

I guess that's good for now.
I'll post more as things progress.
Later,